MIL-PRF-71140A (AR)
4.1.1 Verification conditions. Unless otherwise specified, all verifications shall be performed in
accordance with the test conditions specified in section 4.6.
4.1.2 Classification of characteristics. For examinations and tests cited herein or when required
by contract; critical, major, and minor characteristics are defined in MIL-STD-1916.
4.1.3 Inspection lot formation. Lot formation shall be in accordance with MIL-STD-1916. In
addition, propellant shall be restricted to one lot. All other subcomponents comprising the M793 shall be
restricted to one lot interfix.
4.2 Design verification. When specified in the contract, a sample of M793 cartridges shall be
subjected to design verification and test quantity in accordance with Table II.
4.2.1 Design verification rejection. If any item of the sample fails to comply with the design
verification requirements, the sample shall be rejected, unless otherwise specified in Table II notes.
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business