
DOD-P-63975 (AR)
6.6.1 For a faster and easier method of arriving at the
standard deviation formula, the following alternate method may be
used:
6.7 Drawings. Drawings listed in Section 2 of this
specification under the heading US Army Armament Research and
Development Command (ARRADCOM) may also include drawings prepared
by, and identified as, Edgewood Arsenal, Frankford Arsenal, Rock
Island Arsenal, or Picatinny Arsenal drawings. Technical data
originally prepared by these activities is now under the
cognizance of ARRADCOM.
6.8 First article. When a first article inspection is
required, the contracting officer should include specific
instructions in acquisition documents regarding arrangement for
examinations, test and approval of the documents for first
article.
6.9 Contamination. Particular care should be exercised to
avoid contamination of primers by oil, grease and other foreign
material since each contamination can increase action time and
make the primer unsuitable for use in ammunition.
6.10 Process deviation. A process deviation is defined as a
change in the approved basic method of manufacture, or an
operational change which alters the metallurgical or physical
properties of the item.
Preparing activity:
Custodian:
Army-AR
Army-AR
(Project 1390-A328)
20
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business