MIL-P-46530D(AR)
4.2 Classification of inspections. The following types of
inspection shall be conducted on this item.
First Article Inspection (4.3)
a.
Quality Conformance Inspection (4.4)
b.
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first
article as designated by the Contracting Officer for evaluation in
accordance with the provisions of 4.3.2. The first article sample
shall consist of the following items in sample quantities as
indicated.
Inspection and nonfiring tests:
a.
Drawing
Quantity
Method Para
Part Description
4.5.5
3
Standard test panels
32
4.4.2.1
7258816
Rotating bands
4.4.2.2
125
7258814
Noses
125
4.4.2.3
7258848
Projectile bodies
4.4.2.4
125
11075752
Projectile (uncoated)
4.4.2.5
170
7258846
Projectile (painted)
b.
Firing Test.
Reqmt/Met Para
Quantity
Drawing
Part Description
Projectile, Metal
3.7/4.5.8
4000
7258846
parts
The projectile metal parts, Dwg. 7258846, shall be
identified in accordance with MIL-STD-1168.
See MIL-A-48078 and Table
4.3.2 Inspections to be performed.
I specified herein.
4.3.3 Rejection. See MIL-A-48078. Failure of the original
first article sample to be in accordance with the applicable
drawings and requirements of Table I, as specified herein, will
result in sample disapproval.
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business