MIL-P-85662 (AS)
1/ Failure of the propellant to comply with the requirements
shall be cause for" rejection of the lot subject to testing of
a second sample for the characteristic(s) in which failure
occurred. Failure of the second sample to comply with the
requirements for the characteristic(s) under test shall be
cause for rejection of the lot.
2/ Tolerance on ammunition conditioning temperature shall be
±3°C except when otherwise indicated.
3/ Sample size shall be as specified in MIL-STD-286.
4/ Test performed on composite sample (see 4.2.2).
5/ Test performed in a 10-round group from each of the five
representative samples. Pressure, velocity, and action time
tests may be performed on the same sample.
6/
Calculation performed on composite sample (see 4.2.2).
4.2.3.1 Unlisted firing defects. The lot shall be suspended and
referred to the contracting officer for disposition if a malfunction or
casualty not covered by this specification occuring in any firing test
indicates that the product is unsuited for the purpose intended.
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business