
MIL-PRF-70775B (AR)
TABLE II. Design verification (continued)
Examination or Test 1/
Conformance
Requirement
Inspection
Criteria
Paragraph
Method
Sample
Acc/Rej
Projectile trace (visibility) 7/
3.5.8
4.6.2.7
ISU SS day clear
20
0/1
ISU SS white/black hot
20
0/1
ISU LR day clear
20
0/1
ISU LR white/black hot
20
0/1
IBAS SS day clear
20
0/1
IBAS SS white/black hot
0/1
20
IBAS LR day clear
20
0/1
A3 LR white/black hot
20
0/1
3.5.9
4.6.2.8
Smoke
-32o ± 3oC
10
N/A
21o ± 3oC
10
N/A
52o ± 3oC
10
N/A
Flash
3.5.10
4.6.2.9
-32o ± 3oC
0/1
10
21o ± 3oC
0/1
10
52o ± 3oC
0/1
10
Cook off 12/
543
0/1
3.5.11
4.6.2.10
3.6.1
4.6.3.1
Waterproofness
21o ± 3oC
20
0/1
3.6.2
4.6.3.2
Ruggedness 13/
-46o ± 3oC
240
N/A
63o ± 3oC
240
N/A
Salt fog
30
4/
3.6.3
4.6.3.3
Humidity
30
4/
3.6.4
4.6.3.4
3.6.5
4.6.3.5
Extreme temperature/long term storage 13/
-46o ± 3oC
30
N/A
63o ± 3oC
30
N/A
Final hazard classification 13/
1020
N/A
3.7.1
4.6.4.1
Energetic material qualification
N/A
N/A
3.7.2
4.6.4.2
Energetic material compatibility
N/A
N/A
3.7.3
4.6.4.3
Propellant flame temperature
N/A
N/A
3.7.4
4.6.4.4
Insensitive munitions 13/
420
N/A
3.7.6
4.6.4.6
See notes after Table IV.
4.3 First article inspection. When specified in the contract, a sample of M910 cartridges shall be
subjected to first article inspection and first article quantity in accordance with Table III.
4.3.1 Inspection to be performed. The first article assemblies, components and test specimens
shall be subject to any or all of the examinations and tests specified in Table III.
4.3.2 First article rejection. If any item of the sample fails to comply with the first article
inspection requirements, the sample shall be rejected, unless otherwise specified in Table III notes (see
6.6).
10
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business