MIL-C-46396A(MU)
3.12 Function and casualty .- The cartridge shall function without casualty.
3.13 Air tightness of base closure seal.- The bullet shall not release more
than one bubble of air under the application of a pressure differential of
2 pounds psi.
3.14 Workmanship.- The requirements for workmanship are as specified on
the applicable drawings, referenced specifications and the following.
3.14.1 Metal defects.- The cartridge shall be free of folds, wrinkles,
deep draw scratches, scaly metal, dents and other defects.
3.14.2 Foreign matter.- The cartridge shall be free of corrosion, stains,
discolorations, dirt, oil and smears of lacquer.
QUALITY ASSURANCE PROVISIONS
4.
4.1 Responsibility for inspection.- Unless otherwise specified in the
contract or purchase order, the supplier is responsible for the performance
of all inspection requirements specified herein. Except as otherwise speci-
fied, the supplier may utilize his own facilities or any commercial laboratory
acceptable to the Government. The Government reserves the right to perform
any of the inspections set forth in the specification where such inspections
are deemed necessary to assure supplies and services conform to prescribed
requirements.
4.1.1 Quality assurance terms and definitions.- Reference shall be made
to MIL-STD-109 to define quality assurance terms used.
4.2 Initial production sample.- Prior to the initiation of regular pro-
duction, the supplier shall submit an initial production sample- to a Govern-
ment approved facility for evaluation. The sample shall consist of 600
cartridges. The sample shall be manufactured in the same manner, using the
same materials, equipment, processes and procedures as will-be used in regular
production. All parts and materials, including packaging and packing, must
be the same as will be used in regular production and shall be obtained- from
the same source of supply. After inspection and provisional acceptance at
source, the initial production sample shall be inspected at the Government
approved facility for all requirements of the drawings and specifications.
The Government reserves the right to require new initial production samples
until such time as an acceptable sample is submitted.
4.3 Inspection Provisions.
4.3.1 Lot.
4.3.1.1 Submission of Product.- The product shall be submitted in
accordance with MIL-STD-105.
3
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business