MIL-C-46396A(MU)
Table III (Cont'd)
Acceptance
First
Cumulative
Sample
(1st & 2nd Sample\
Defects
d.
Blown primer or primer falls out of
0
1
pocket on retraction of bolt
e. Primer remains in pocket but is
2
3
physically loose
4. Case casualties
a. Longitudinal split 2/
18
(1) Neck and shoulder (I or S)
3
(2) Body (J)
2
(3) Body (K)
1
(4) To head (L)
1
(5) Through head (M)
b. Circumferential rupture 2/
3
2
(1) Partial, shoulder or body (J&S)
1
0
(2) Partial, body (K)
0
1
(3) Partial, head (L)
0
1
(4) Complete
c. Flash tube
1
0
(1) Missing flash tube 3/
9
0
(2) Flash tube remaining in bore
1
0
5. Failure to extract
1
0
6. Weapons stoppage 4/
1/ No second sample permitted Lot shall be rejected.
2/ For location of defects indicated by letters in parentheses, see Drawing
C7643674.
3/ A loose flash tube shall carry no penalty.
4/ All stoppages attributable to the ammunition, with the exception of mis-
fire, complete rupture or failure to extract, observed in all tests shall
be included.
4.3.4 Packaging, packing and marking inspection.- During or immediately
prior to the packaging operation, 100% examination of the cartridges shall be
performed to ascertain that the cartridge type conforms to the drawing.
occurrence of a high pressure test cartridge shall be classed as a critical
de feet. Occurrence of any type other than HPT shall be classed as a major
defect. All nonconforming cartridges shall be rejected. Inspection for
packaging, packing, and marking shall be in accordance with MIL-STD-644, as
applicable to the drawing.
4.3.5 Inspection equipment.- The examination and tests shall be made
using the equipment 'listed on IEL-8594735.
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business