MIL-L-45403D
a. First Article Inspection.
b, Quality Conformance Inspection
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first article as
designed by the Contracting Officer for evaluation in accordance with the
provisions of 4.3.2. The first article shall consist of the following items
in sample quantities as indicated.
Part Description
Drawings
Quantity
Link, Cartridge, Metallic
7268389
Belt, 7.62MM, M13
2600
4.3.2 Inspections to be performed.
See MIL-A-48078 and Table I herein.
4.3.3 Rejection. Rejection of first article sample shall be in
accordance with Table I and MIL-A-48078.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business