DOD-P-63975 (AR)
3.13.1 Processing defects. The primer shall be free of
cracks, splits, deep scratches, dents, metal slivers, burrs,
distortion, missing or unfinished component(s) and other forms of
substandard workmanship.
The primer shall be free of all foreign
3.13.2 Cleanliness.
matter (see 6.9).
4. QUALITY ASSURANCE PROVISIONS
4.1 Responsibility for inspection and standard quality
assurance provisions. Unless otherwise specified herein or in the
contract, the provisions of MIL-A-48078 shall apply and are hereby
made a part of this detail specification.
4.2 Classification of inspections. The following types of
inspection shall be conducted on this item:
First Article Inspection (See 4.3)
a.
Quality Conformance Inspection (See 4.4)
b.
4.3 First article inspection.
4.3.1 Submission. The contractor shall submit a first
article as designated by the Contracting Officer for evaluation in
accordance with the provisions of 4.3.2. The first article sample
shall consist of the following items in sample quantities as
indicated.
Quantity
Drawings
Part Description
125
11825912
Cup, Closure
125
11825913
Cup, Outer
Tapered Button, 22 volt,
125
11825911
primer, Mod 1
125
11825917
Insulator
Cup-insulator button
125
Assembly
1430
11825910
Primer Assembly
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business