MIL-C60813 (AR)
Failure of two or more cartridges to comply with the applicable require-
ment shall be cause for rejection of the lot. If one cartidge fails in
the first test, a second sample consisting of double the number of cartridges
in the first sample may be tested. If any failing cartridges are found in
the second sample, the lot shall be rejected.
Failure of one or more cartridges to comply with the applicable require-
ment shall be cause for rejection of the lot. No second sample permittted.
Failure of seven or more cartridges to comply with the applicable require-
ment shall be cause for rejection of the lot. If more than three but less
than seven cartridges fail in the first test, a second sample consisting of
double the number of cartridges in the first sample shall be tested. The lot
shall be rejected if in the combined first and second sample seven or more
cartridges fail to comply with the applicable requirement.
Failure of the cartridges to comply with the applicable requirement shall
be cause for rejection of the lot subject to testing of' a second sample con-
sisting of double the quantity of cartridges used in the first test. Failure
of the cartridges in the second sample to comply with the applicable require-
ment shall be cause for rejection of the lot.
Failure of 15 or more cartridges to comply with the applicable requirement
shall be cause for rejection of the lot. If more than five but less than 15
cartridges fail in the first test, a second sample consisting of double the
number of cartridges in the first sample may be tested. The lot shall be re-
jected if, in the combined first and second sample, 15 or more cartridges
fail to comply with the applicable requirement.
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business