MIL-DTL-48623A (AR)
Table III. Conformance tests - Continued
DRAWING
NUMBER
CARTRIDGE, CALIBER .50, BLANK, M1A1
9326760
CONFORMANCE
INSPECTION
CRITERIA
REQUIREMENT
EXAMINATION OR TEST
METHOD
PARAGRAPH
REFERENCE
QTY
Ac
Re
Notes:
5/ The lot shall be rejected when function and casualty defects plus firing defects
observed in all other firing tests exceed the acceptance number for the cumulative sample
in Table III. If the number of defects found in the first test exceeds the acceptance
number for the first sample but is equal to or less than the acceptance number for the
cumulative sample, a second sample consisting of double the quantity specified under
function and casualty test shall be fired in the service weapon specified therefore. This
procedure shall apply regardless of the weapon or weapons in which the firing defects
occurred in the first test. If the total number of defects in the combined first and second
sample exceeds the acceptance number for the cumulative sample, the lot shall be
rejected. If, in testing a second sample, defects other than those for which the second
sample is being tested should occur to the extent that they exceed the acceptance number
for the cumulative sample, the lot shall be rejected.
6/ Cartridges shall be conditioned at the specified temperatures for a minimum of four
hours after test temperatures of item has been reached.
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business