MIL-P-45172F(MU)
4.3.4 (Cont)
2/ If two or more units of the sample fail to comply with the adapter
hardness requirement, the lot shall be rejected. If one unit fails to
comply with the requirement, a second sample consisting of the same number
of units as specified for the first sample shall be tested. If in the
accumulated samples, two or more units fail to comply with the hardness
requirement, the lot shall be rejected.
3/ If two or more units of the sample fail to comply with the nose hardness
requirement, the lot shall be rejected. If one unit fails to comply with
the requirement, a second sample consisting of the same number of units
as specified for the first sample shall be tested. If in the accumulated
samples, two or more units fail to comply with the nose hardness require-
ment, the lot shall be rejected.
4/ If one or more units of the sample fail to comply with the adapter
security requirement, the lot shall be rejected.
5/ If two or more units of the sample have an average radial void, between
the seated band and the band seat, greater than 0.004 inch, the lot shall
be rejected. If one unit of the sample has an average radial void, greater
than 0.004 inch, a second sample consisting of the same number of units as
specified for the first sample shall be tested. If in the accumulated
samples, two or more units have an average radial void greater than 0.004
inch, the lot shall be rejected.
6/ Rejection of one or more units of the sample by the flaw detector in
the test for adapter metal soundness shall be cause for rejection of the
lot.
7/ Failure of the flaw detector to reject PCS No. 1 shall be cause for re-
jection of all assemblies inspected for "soundness" since the preceding
test and shall require requalification of the equipment for automatic in-
spection. (see 4.4.5)
8/ Failure of the phosphate coating on the standard panels to comply with
the applicable requirements shall be cause for rejection of all assemblies
phosphate since the preceding test.
9/ If two or more units of the sample fail to comply with the requirement
for paint adhesion, the lot shall be rejected. If one unit of the sample
fails to comply with the requirement, a second sample consisting of the
same number of units as specified for the first sample shall be tested.
If in the accumulated samples, two or more units fail to comply with the
requirement for paint adhesion, the lot shall be rejected.
11
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business