MIL-P-45172F(MU)
PREPARATION FOR DELIVERY
5.
5.1 Packing, Level C.-Each lot of projectiles shall be packed as specified
by Dwg. F7258861 or Dwg. D7259136. Each lot of closure discs and each lot
of noses shall be bulk packed in accordance with MIL-STD-1169.
5.2 Marking and labeling. -Marking or labeling of packed containers shall
comply with applicable requirements of MIL-STD-1169.
6.
NOTES
6.1 Ordering data. -Invitations for bids and contracts or orders will
specify the following:
6.1.1 Title, number, and date of this specification.
6.1.2 Place of inspection, if not place of manufacture.
(see 5.1 and 5.2)
6.1.3 Packing and marking instructions.
6.1.4 Provision for shipment and testing of production lot samples for
metal parts security. (see 4.4.10)
6.1.5 Provision for the supply, maintenance and disposition of mandatory
ballistic test equipment for acceptance inspection purposes.
6.2 First article sample. -Where an initial production sample is required
by the contract, the contracting officer will notify the test facility when
to proceed with the metal parts security test. (see 4.2) Additional pro-
jectiles may be required by the test facility.
6.3 Process deviation. -A process deviation is defined as a change in the
approved basic method of manufacture, or an operational change which alters
the metallurgical or physical properties of the item of contract.
6.4 AQL's. -The optional use of AQL values for either individual defects
or classes of defects, with individual major defect limitation, is intended
to minimize inspection agency administrative burden which might result from
an exclusive assignment of individual defect AQL's. The option also permits
flexibility where sampling inspection for acceptance is integrated into the
manufacturing process.
15
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business