MIL-DTL-12779D
TABLE III. First article inspection.
Inspection
Conformance Criteria
Requirement
Examination or Test
Method
Paragraph
Qty
Acc
Rej
Reference
Case (dwg. 10524075)
5 2/
0
1
3.3, 3.11
Visual/Gage
3/
Cartridge, Caliber .45, Blank, Line,
Throwing M32
Examination for defects
3.3, 3.11
Table V
Critical defect
500
0
1
Major defect
192
0
1
1/
Minor defect
40
0
1
1/
Notes:
1/ For first article only, inspection sampling shall be tightened to VL V for majors and VL III
for minors in accordance with MIL-STD-1916. A random sample of 192 cartridges for major
defects shall be selected from the 500 cartridges. The first 40 shall be inspected for major and
minor defects and the rest shall be inspected for major defects.
2/ Per station per machine. Each station of each machine is considered a separate
manufacturing process.
3/ To be inspected for all drawing requirements using standard measuring and test equipment
(except for workmanship which is inspected for visually).
TABLE IV. First article and conformance tests.
Conformance Criteria
Inspection
Test
Requirement Paragraph
Method
Qty Acc
Rej
Reference
Waterproof
20
1/
3.3
4.5.1
Primer sensitivity
800
2/
3.5
4.5.2
Residual stress (mercurous
50
1/
3.6
4.5.3
nitrate)
Velocity
4.5.4
70° ± 2°F
20
3/ 5/
3.7
0° ± 2°F
20
3/ 5/
3.7
120° ± 2°F
20
3/ 5/
3.7
Chamber pressure
4.5.5
70° ± 2°F
20
4/ 5/
3.8
0° ± 2°F
20
4/ 5/
3.8
120° ± 2°F
20
4/ 5/
3.8
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business