MIL-DTL-1318C (AR)
4. VERIFICATION
Table I. Requirements/verification cross-reference matrix
METHOD OF VERIFICATION
CLASSES OF VERIFICATION
Section 3
1- Analysis
A - First article
Requirement
2 - Demonstration
B - Conformance
3 - Examination
4 - Test
Verification
Verification
Section 4
Methods
Class
Verification Procedures
12
3
4
A
B
First Article
3.1
XX
X
4.3, Table II, Table III, Table VI
Conformance
3.2
XX
X
4.4, Table IV, Table V, Table VI
Cartridge
3.3
X
X
X
Table III, Table IV, Table V,
Table VI
Bullet Extraction
3.4
X
X
X
4.5.1
Residual Stress
3.5
X
X
X
4.5.2
Waterproof
3.6
X
X
X
4.5.3
Accuracy
3.7
X
X
X
4.5.4
Action Time
3.8
X
X
X
4.5.5, 4.5.12
Velocity
3.9
X
X
X
4.5.6, 4.5.12
Pressure
3.10
X
X
X
4.5.7, 4.5.12
Function & Casualty
3.11
X
X
X
4.5.8
Air Tightness
3.12
X
X
X
4.5.9
Trace
3.13
X
X
X
4.5.10
Stripping
3.14
X
X
4.5.11
Workmanship
3.15
X
X
X
4.5.13, Table V
Ammo Lot Number
3.16
X
X
X
4.5.14
Mixed Ammunition
3.17
X
X
X
4.5.15
4.1 Classifications of inspections. The inspection requirements specified herein
are classified as follows:
a.
First article inspection (see 4.3)
b.
Conformance inspection (see 4.4)
4.2 Inspection conditions. Unless otherwise specified, all inspection shall be
performed in accordance with the test conditions specified in 4.5.
4.3 First article. When specified, a sample of the M17 cartridges shall be
subjected to first article verification in accordance with Table III and Table VI.
4.3.1 First article quantity. The first article sample shall consist of the following
items in sample quantities as indicated in Table II.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business