MIL-P-50601A(MU)
4.2 Classification of inspections.-The inspection requirements specified
herein are classified as follows:
1. First article inspection (see 4.3)
2. Quality conformance inspection (see 4.4)
4.3 First Article Inspection.
4.3.1 First article sample. -The sample shall be delivered for inspection
in accordance with first article approval provisions of the contract and
MIL-A-2550, and shall consist of:
Inspection and nonfiring tests:
a.
3
standard test panels (see TT-C-490)
32
rotating band blanks
125
noses
bodies, without rotating band
125
125
body, rotating band assemblies, uncoated
125
projectile metal parts assemblies, painted
b.
Firing test:
4,000 projectile metal parts assemblies
The projectile assemblies shall be identified in accordance with MIL-STD-
1168.
4.3.1.1 Inspection. -After inspection by the contractor and provisional
acceptance by the Government activity, the sample will be inspected in
accordance with the provisions of MIL-A-2550. Failure of the original
first article sample to be in accordance with the applicable drawings
and the requirements of Para. 3, as specified herein, will result in
sample disapproval. (see 6.3)
4.4
Quality Conformance Inspection.
4.4.1 Submission of product. -The product shall be submitted in accordance
with MIL-STD-105 or MIL-STD-1235, as applicable.
4.4.1.1 Lot. -A lot shall consist of projectile metal parts assemblies
produced by one manufacturer in one unchanged process, in accordance with
the same drawings and drawing revisions, and same specification and
specification revision.
4.4.1.2 Lot identification. -Each projectile metal part assembly and each
packed lot shall be identified in accordance with applicable drawings and
MIL-STD-1168.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business